Starting The Sequence; Start-Up Prerequisites - Festo MPS 8049013 Manual Del Usuario

Ocultar thumbs Ver también para MPS 8049013:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Storage station

11.8 Starting the sequence

1. Check power supply and compressed air supply.
2. Before aligning, manually remove the workpieces from the module and station transfer points.
3. Conduct the alignment procedure. The alignment procedure is prompted by the blinking ALIGN key and
is carried out after the key has been pressed.
4. Place a workpiece onto the beginning of the conveyor.
5. Start the separating station's sequence. Start-up is prompted by the illuminated START key and is
executed after the key has been pressed.
Notes
The sequence can be stopped at any time by pressing the emergency stop button or
the STOP key.
You can select either continuous cycling (AUTO) or a single cycle (MAN) with
the help of the AUTO/MAN key switch.
The following applies when several stations are combined:
The individual stations are aligned in the order opposite the direction of material flow.

11.8.1 Start-up prerequisites

The following prerequisites must be fulfilled:
Visual inspection completed
Protective devices tested for correct functioning
58
Caution
If any damage is detected, danger of injury may occur during operation.
Malfunctions which may impair safety must be reported to appropriately trained
personnel and eliminated immediately!
© Festo Didactic 8049748
Tabla de contenido
loading

Tabla de contenido