BP7300-7 CF712 PRO SERIES.qxp_BP7300 3/2/15 1:48 PM Page 6
4. Installing the Hanger Ball/Downrod Assembly
4.1
Pass the 42" motor leads through the opening in the
ceiling cover.
Be sure the cover is oriented correctly (Figure 2).
4.2
Separate, untwist and unkink the three motor leads.
Route the motor leads through the hanger ball/downrod
assembly (Figure 3).
(For Standard Mounting)
Figure 2
Figure 3
6
THREE 42"
MOTOR LEADS
CEILING
COVER
THREE 42"
MOTOR LEADS
HANGER
BALL/4.5"
DOWNROD
ASSEMBLY
U.L. Model No.: 52-ANT