Jacuzzi S344000 Instrucciones De Instalación página 3

Base para ducha
Ocultar thumbs Ver también para S344000:
Idiomas disponibles

Idiomas disponibles

STEP 4. Install finishing materials and caulk base leaving 1/4" weep holes.
Figure 4A
STEP 3. Install cement board.
CEMENT BOARD
SILICONE
SEALANT
1/4" MINIMUM
WEEP HOLE
CEMENT
BOARD
STUD
BLOCKING
SHIM IF NECESSARY
Figure 4C
Filling the area marked DO NOT FILL will prevent moisture
from draining back into the base through the weep holes.
BLOCKING
Figure 3
1/4" MINIMUM
WEEP HOLE
SILICONE
SEALANT
TILE
GROUT
SILICONE
SEALANT
DO NOT FILL
3
TILE
CEMENT
BOARD
TILE
ADHESIVE
1/8" GAP
BLOCKING
Figure 4B
loading