Unico Boiler Master And Unico Boiler Wall Communication Line; Communication Between The Two Units; Routine Maintenance; Delivery Of The System - Olimpia splendid UNICO BOILER MASTER Instrucciones Para La Instalación, Uso Y Mantenimiento

Ocultar thumbs Ver también para UNICO BOILER MASTER:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

2
2.4
UNICO BOILER MASTER PERIODIC MAINTENANCE
The air conditioner that you have purchased has been designed to reduce routine maintenance operations to a minimum. These
operations involve solely the cleaning operations outlined below:
-
Cleaning of the condensing battery and cleaning of the condensate management system. These operations must be carried
out by skilled technicians on a regular basis that will depend on the place of installation and intensity of use. Depending on the
care not to deform them) or more thoroughly using dedicated detergents.
OPERATION TO BE PERFORMED WHEN THE MACHINE IS SWITCHED OFF AND THE POWER SUPPLY IS DISCONNECTED.
UNICO BOILER MASTER
-
reclose and hook the front air aspiration grill
2.5
UNICO BOILER WALL PERIODIC MAINTENANCE
should be descaled roughly every two years.
The operation can be performed by breaking off the encrusted limescale while being careful not to damage the protective

DELIVERY OF THE SYSTEM

Before you leave the site of installation you should gather up all packing material and use a damp cloth to remove any traces of
maintenance and cleaning.
48
Tabla de contenido
loading

Este manual también es adecuado para:

Unico boiler wall

Tabla de contenido