1. First insert the awning frame into
the ceiling brackets (Fig. L).
2. Place the lock nut (14) onto the
threaded spindle (3a) (Fig. M).
3. Insert the tie rod (25) through the
hole in the threaded spindle (3a)
and turn it to change the height of
the post (Fig. M).
Note: please note the maximum
extension length (max. 5cm) of the
threaded spindle (3a).
4. Turn the lock nut (14) in the floor
bracket (13) to fasten the thread-
ed spindle (Fig. M).
Note: please note that the thread-
ed spindle (3a) may only be
unscrewed by no more than 5cm
(Fig. M).
5. Finally, fasten the posts on each
ceiling bracket with 2 screws (21)
and washers (23) (Fig. N).
Note: for easier installation, drill
two holes into each ceiling bracket
before fastening the posts.
Installing the drop arms
and front bar
1. Unscrew the knurled screw (4a),
the corresponding nut (4b) and
the drop arm bracket (4c) from
each drop arm (4).
2. Place the drop arm bracket (4c)
on a post (1/2) (Fig. O).
Note: ensure that both drop arm
brackets (4c) are fixed at the same
height on the posts (approx. 40cm
from the bottom edge of the upper
post to the bottom edge of the drop
arm bracket).
3. Tightly screw the drop arms back
into each drop arm bracket (4c)
with the knurled screws (4a) and
the corresponding nuts (4b).
Note: the knurled screw (4a) points
outwards.
4. Fasten each drop arm (4) onto
the front bar (7 + 8) with the
knurled screws (24) (Fig. P).
Use (Fig. Q)
1. Hook the hand crank (1a) into the
crank lug (1b) of the upper post
(1).
2. Turn the hand crank (1a) to open
or close the product.
3. Remove the hand crank (1a) after
each use and store it in a secure
location.
Storage, cleaning
When not in use, always store the
product clean and dry at room
temperature.
Clean only with water and wipe dry
afterwards with a cloth.
IMPORTANT! Never clean the prod-
uct with harsh cleaning agents.
Leave the product open to dry.
GB/IE
23