TYPICAL CONNECTION AND CABLE SECTION
Art. ECA8
Line
INSTALLATION
Introductory note: Dig a hole big enough to hold the foundation box, calculate the re-
quired opening angle, insert the sheath for laying the power cable and that for laying the
limit switch cables (where applicable), make water drainage holes in the ground and ce-
ment the box solidly.
GATE WING OPENING ANGLE
Establish the required opening angle
Installation of mechanical limit stops.
At the open and closed positions of the sliding gate, it is recommended that mechani-
cal limit stops are fitted which are able to stop the movement of the gate during both
opening and closing. Always follow the recommendations of the various relevant stan-
dards. In the case of gates longer than 1.6 m the use of an elbow-bolt, type ZD06 (Fig.
4) or ZD26, with electric door lock Art. ZD04 (Fig. 4A) is recommended.
Positioning the gate:
Place the gate in a vertical position making sure that the pin of the gearmotor is prop-
erly positioned in the dowel welded to the support bracket and that the pin is directly in
line with the upper hinge of the gate.
VERY IMPORTANT:
Drain pipe must be perfectly clean inside to ensure the rapid discharge of rain water.
Cover the entire pipe length with gravel to facilitate water drainage and prevent earth
from entering and clogging the drain pipe.
Art. EFA1
4X0,75 mm2
Fig.4
EI40
Photocell
Fig.4A
10/24
Photocell
Pillar
Internal view
Pillar
Internal view
Art. ELA1
Art. EFA1
Box
position
Fig.3
Box
position
Fig.3A