BlueHelix HiTech RRT H
3.2 Commissioning
Before lighting the boiler
• Check the tightness of the gas system.
• Check correct expansion vessel precharge.
• Fill the hydraulic system and make sure that all air contained in the boiler and the system has
been vented.
• Make sure there are no water leaks in the system, DHW circuits, connections or boiler.
• Make sure there are no flammable liquids or materials near the boiler.
• Check correct connection of the electrical system and efficiency of the grounding system.
• Fill the trap (see cap. 2.7 "Condensate drain connection").
IF THE ABOVE INSTRUCTIONS ARE NOT OBSERVED
B
THERE MAY BE RISK OF SUFFOCATION OR POISON-
ING DUE TO GAS OR FUMES ESCAPING; DANGER
OF FIRE OR EXPLOSION. ALSO, THERE MAY BE A
RISK OF ELECTRIC SHOCK OR FLOODING THE
ROOM.
First boiler ignition
• Make sure there is no draw-off of hot water and room thermostat requests.
• Turn on the gas and check that the gas supply pressure ahead of the unit complies with the
technical data table or in any case the tolerance provided for by the regulations.
• Turn on the power to the boiler, the display shows the software version number of the control
unit and the display and then FH and Fh air venting cycle (see cap. 1.3 "Connection to the pow-
er supply, switching on and off" on page 300).
• At the end of the Fh cycle, the winter mode screen will appear on the display (fig. 11), make
the temperature adjustments: heating flow and DHW outlet (fig. 14 and fig. 15). Check if the
value of flue parameter, P68 - *** '- Transparent Parameters Table' on page 328 ***, is suitable
for the length of flue installed.
• In case of a gas change (G20 - G30 - G31 - G230), check if the relevant parameter is suitable
for the type of gas used in the supply system ( and cap. 3.1 "Adjustments" on page 325).
• Put the boiler in DHW or heating mode (see cap. 1.3 "Connection to the power supply, switch-
ing on and off" on page 300).
• In Heating mode, do a request: the radiator symbol flashes on the display and the flame ap-
pears when the burner ignites.
• DHW mode with hot water tank preparation in progress: the faucet symbol flashes on the dis-
play and the flame appears when the burner ignites.
• Do the combustion check as described in the paragraph "Checking the combustion values" on
page 325.
EN
cod. 3541V480 - Rev. 00 - 04/2021
331