Start-Up Instructions - IML BIG DISCOVERY DY350T Manual De Instalación Y Mantenimiento

Ocultar thumbs Ver también para BIG DISCOVERY DY350T:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Mod.
CODE
1
DY350T
2
DY400T
3
DY550T
Use a connecting cable type H07 of a suitable electrical section for the consumed intensity by
the pump motor.
Before connecting the motor, check the necessary fuse type.
Adjust the correct thermical value according to the needs of each pump.
Verify the right connection of the ground cable to the installation.
It is very important to keep to the installation and electrical connection conditions. Should they
not be heeded, the pump manufacturer does not accept any responsibility and considers the
guarantee void.
The motors are subject to ECC regulations with IP-55 protection.
Special installation regulations may exist.
The main cable can only be connected by qualified and authorised personnel (Type three-phase
connection).
Incorrect mains connection could result in death.

4. START-UP INSTRUCTIONS

QUESTIONS PRIOR TO START-UP
Before starting up the pump, carry out the following operations:
1. Open the pre-filter cover (See Fig.4).
2. Fill the pump with water through the pre-filter until it dips into the suction tube.
HEAT PROTECTOR TABLE
V.
HP
230/400
3
230/400
4
230/400
5.5
kW
Intensity relay regulation (A)
2.2
2.9
4
32
8 / 4.8
12.6 / 7.3
14.9 / 8.6
Tabla de contenido
loading

Este manual también es adecuado para:

Big discovery dy400tBig discovery dy550t

Tabla de contenido