Electrolux EXO36HEIWE Manual De Instalación página 16

Ocultar thumbs Ver también para EXO36HEIWE:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 218
16 www.electrolux.com
the connecting pipe, drain pipe and
cables.
• To balance the ceiling and to avoid
vibration, please enforce the ceiling
when necessary.
2.
Please select the position of
installation hooks according to the
hook holes on the installation board.
• Drill four holes of ø12mm, 50~55mm
deep at the selected positions on the
ceiling. Then embed the expansible
hooks (ttings).
• Face the concave side of the installation
hooks toward the expansible hooks.
Determine the length of the installation
hooks from the height of ceiling, then
cut off the unnecessary part.
• If the ceiling is extremely high, please
determine the length of the installation
hook according to facts.
Product dimension
Fig.13
Drain side
Fig.14
Body
Nut
Ceiling
A
545 (Hook-location)
570 (Body)
647 (Panel)
600
• Cut the installation hook open in the
New built houses and ceilings middle
position, then use apropriate length of
reinforcing rod (ø12) to weld together
The length could be calculated from
Fig.15: Length=210+L(in general, L is half
of the whole length of the installation hook)
Fig.15
Ceiling
3.
Please adjust the hexangular nuts on
the four installation hooks evenly, to
ensure the balance of the body.
• Use the lever indicator check the lever
from four sides of the main body. (Refer
to Fig.16)
Fig.16
• If the drainpipe is awry, leakage will
be caused by the malfunction of the
waterlevel switch.
• Adjust the position to ensure the gaps
(Unit: mm)
between the body and the four sides of
ceiling are even.
• The body's lower part should sink into
the ceiling for 10~12mm.
Hook
• Locate the air conditioner rmly by
wrenching the nuts after having
adjusted the body's position well.
Panel
Body
Horizontal
indicator
Tabla de contenido
loading

Tabla de contenido