New built houses and ceilings
1.
In the case of new built house, the
hook can be embedded in advance
(refer to the existing ceiling installation
mentioned above). But it should be
strong enough to bear the indoor unit
and will not become loose because of
concrete shrinking.
2.
After installing the body, please fasten
the installation paper board onto the
air conditioner with bolts (M5×16)
to determine in advance the sizes
and positions of the hole opening
on ceiling. Please rst guarantee the
atness and horizontal of ceiling when
installing it. Refer to the existing
ceiling installation mentioned above
for others.
3.
Refer to the existing ceiling installation
mentioned above for installation.
4.
Remove the installation paper board.
Install The Panel
CAUTION!
Never put the panel face down on
floor or against the wall, or on bulgy
objects.
Never crash or strike it.
Remove the inlet grid.
1.
Slide two grid switches toward the
middle at the same time, and then
pull them up.
Fig.17
Grid
switch
2.
Draw the grid up to an angle of about
30°, and remove it.
Fig.18
3.5 Install the panel
1.
Align the swing motor on the panel
to the water receiver of the body
properly. (Refer to Fig.19)
2.
Hang the four fixed rope of the main
body to the installation cover and
the other three covers of the swing
motor: (Refer to Fig.19 )
Fig.19
Steel rope
1
1
Cover
Please operate according
n of the arrow, or it can not
be disassembled when it
is necessary.
CAUTION!
The installation cover of the
swing motor must sink into the
corresponding water receiver.
3.
Install the panel on the main body
with bolt (M5X16) and washer. (Refer
to Fig.19)
4.
Adjust the four panel hook screws to
keep the panel horizontal, and screw
them up to the ceiling evenly.
5.
Regulate the panel slightly to t the
panel's center to the center of the
ceiling's opening. Guarantee that
hooks of four corners are xed well.
6.
Keep fastening the screws under the
ENGLISH
17
Drain side
2
3
Swing motor
installation cover
Bolt,
Swing
motor side
washer
4