Water Connections - Jacuzzi Professional ENJOY Manual Del Usuario

Ocultar thumbs Ver también para Professional ENJOY:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
THREE-PHASE TOP
Power supply
Total consumption electric heater
(three-phase)
(12 kW) +pumps+lights
Volt
Hertz
Ampere
(*)
50/60
220 - 240 3~
45
50/60
26
380 - 415 3N~
(*): special standard (not valid for Europe)
WEIGHTS
HOT TUB
average volume
net weight
of use
kg
litres
~ 1700
~ 250
concentrated load on
resting surface
resting surface
m
2
kg/m
2
1,13
2080
max weight
at full load
kg
LOWERED
~ 900
RETAINER
TUB (V1)
RETAINER
~ 925
TUB (V)
SPA-PAK
~ 285
Heat exchanger (optional)
- MAX primary circuit temperature .............................................................50 °C
- Connections.....................................................................................................................3/4"
- Primary circuit flow rate ..............................................................................38 l/min
- Primary pressure drop .....................................................................0,271 m H 2 O
Components
Components and the necessary connections for setting up the system
i
are described below (see
Hot tub and plumbing
1
overflow channel with grid
2
buttons
- (a) THREE-PHASE Spa-pak
- (b) SINGLE-PHASE Spa-pak
2a
box for connection of buttons
3
low-point drain with gate valve
to the balance tank (overflow lines)
4A1+4B1
4A2+4B2
to the balance tank (overflow lines)
5
hydromassage pump suction lines
6
hydromassage pump delivery lines
7
filtering suction line
8
suction line from the balance tank
9
filtering return line
10
blower line
11
connections to the water system
12
perimeter metal supports
Spa-pak
13
THREE-PHASE Electric wiring box
13a
SINGLE-PHASE Electric wiring box
Total consumption only pumps and
lights (heat exchanger version)
kW
Ampere
(j)
17
13
(j)
17
8
(j): max. power absorption
MAX water
max. total
volume
litres
~ 2100
~ 2350
ground resting
surface
m
2
~ 1,8
~ 500
~ 1,2
~ 1,1
~ 260
2-2a-3-3a).
14
optional - 14b: heater or 14a: heat exchanger
15
hydromassage pumps
16
filtering pump
kW
17
blower (where present)
(j)
5
(j)
18
quartz sand filter
5
19
safety switch
20
temperature sensor
21
flow switch (models with heater)
Balance tank
22
water loading/filling solenoid valve (3/4")
weight
23
level switches
kg
24
check valve
25
gate valve (for emptying)
26
pre-filters (where present)
27
overflow
28, 29
ground drainage points
30
gate valves (for system maintenance)
31
gate valves (for suction balancing)
ground
load
32
hose draining (areas at risk from ice)
kg/m
2
Spa-pak "booster kit" (optional)
33
~ 770

Water connections

I
The plumbing system (including connectors, gate valves, etc.,
2a-3-3a) for connecting the Hot tub to the Spa-Pak and the balance
tank, must be set up by the installer.
I
The Customer must provide the ground drainage points (
3-3a, detail 28 and 29) of suitable dimensions, which can be inspect-
ed for any cleaning, and to which the low-point drain ø 50 mm (
2a-3-3a, detail 3), the loading/overflow of the balance tank and the
drain from the filter are to be connected.
Spa-pak "booster kit": in the instance where a spa-pak "boost-
er kit" is also installed, it must be connected to the drainage sys-
tem; refer to the relative documentation.
CAUTION! Before preparing the ground drainage points,
consult the local authority for the regulations that control
the drainage of chemically treated water.
I
In particularly cold areas, to avoid the risk of any remaining water
freezing (water that may remain in plumbing after emptying the sys-
tem) it is advisable to install valves for the complete drainage of plumb-
i
ing (
2-2a-3-3a, detail 31).
I
To fill the spa, you can use a garden hose, or provide connections to the
plumbing system of the home as shown in
IMPORTANT: the 3/4" solenoid valve on the balance
tank (for automatic filling of water level) must always be
connected to the water system that supplies the system.
Any connections to the drinking water system (other
than the recommended ones) must be carried out
according to EN1717 regulations, using "AA", "AB" or
21
i
2-
i
2-2a-
i
2-
i
2-2a-3-3a, detail 11.
Tabla de contenido
loading

Tabla de contenido