Inspection And Testing; Bathtub Water And Operational Test; Framing And Support; Installation Instructions For Tubs With Integral Overflow - Jacuzzi AVVIO Manual De Instalación Y Del Operario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Inspection and Testing

Visual Inspection
Remove the bathtub from the shipping packaging. Be careful not to scratch the surface of the bathtub from exposed staples,
1
screws, or nails. Retain the packaging until satisfactory inspection of the product has been made.
Inspect the shell and bathtub components. Should inspection reveal any damage or defect in the finish or visible damage to
2
any components, do not install the bathtub. Damage or defect to the finish claimed after the bathtub is installed is excluded
from the warranty. Jacuzzi Luxury Bath responsibility for shipping damage ceases upon delivery of the products in good order
to the carrier.
Refer any claims for damage to the carrier. For definitions of warranty coverage and limitations, refer to the published
3
warranty information packed with the product or in the back of this manual. Please Note: Blemishes, air holes, or casting
marks on the underside of the bath are not considered defects and do not affect performance or quality of bath.

Bathtub Water and Operational Test

All bathtub units are factory tested for proper operation and watertight connections prior to shipping. However, the unit must be
retested by the installer prior to installation. Jacuzzi Luxury Bath is not responsible for any defect that could have been discovered,
repaired, or avoided by following this inspection and testing procedure:
Place the bathtub on a level surface, near appropriate water supply, and water drainage. A driveway is a suitable choice.
1
Cover the drain and overflow hole with tape or a stopper and fill the bathtub to the bottom of the overflow hole.
2
Allow bathtub to stand for 5 minutes.
3
Visually inspect for leaks. Do not install the bathtub if leaks are detected.
4
Return bathtub to packaging or otherwise protect from damage until time of installation.
5

Framing and Support

READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THE
WARRANTY.
IMPORTANT
• Make sure that walls and floors meet fire safety requirements of local building code and/or FHA/HUD Minimum Property
Standards.
• Observe all governing codes and ordinances.
• Proper installation is your responsibility. Have a qualified technician install this bath.
• Ensure location is structurally sound, flat and level. A Technical Specification has been included with your bathtub. The Technical
Specification will contain pertinent information regarding your Jacuzzi Luxury Bath product. Locate the Technical
Specification at this time.

Installation Instructions For Tubs With Integral Overflow

The integral overflow tubs by Jacuzzi® Luxury Bath will require only the waste to be installed. The P-trap will be located
1
directly underneath the drain (see specification sheet for the location). The tub comes equipped with a toe/tap drain as
illustrated (Figure 1).
Stub up top of PVC drain fitting 1/2" from the finished floor level (Figure 1). Use clear silicone to adhere the gasket to the
2
bottom side of the tub (Figure 1).
Carefully lift tub and apply a bead of clear silicone or construction adhesive to the bottom edge of tub (Figure 1).
3
CAUTION! Before applying construction adhesive, please make sure that the permanent location of the bathtub has
been determined.
Carefully lower tub over the drain, then thread the metal drain toe/tap into the PVC drain fitting. Wipe off excess silicone or
4
construction adhesive with a clean cloth (Figure 1). Water test tub for leaks.
Page 4
AVVIO™ Luxury Solid Surface Collection
Installation and Operation
Tabla de contenido
loading

Tabla de contenido