Installation & Assembly - Urrea BAL24A Manual De Usuario Y Garantía

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPT
OPT/HID key.
ENTER
Enter key.
Apagado
Apagado
Emergency stop key.
Stop
Stop
Start key.
Encendido
Encendido
Start
Start
Interna
Interna
Inner unbalance value and pa-
Inner
Inner
rameter of the tire display.
Externa
Externa
Outer unbalance value and
Outher
Outher
parameter value of the tire
display.
nterna
nterna
Unbalance point positioning
Externa
Externa
O th r
O th r
STA
lamp.
T
C
INSTALLATION & ASSEMBLY
Before installation and use of the wheel bal-
ancer, you should carefully read this instal-
lation and operation manual. And keep this
manual in hand for reference at any time. You
should be sure that all the operators have read
this manual to guarantee the most perfect
functions of the machine and meanwhile the
safety.
UNPACKING
Remove the upper cover of the package car-
ton and check and confirm the wheel balancer,
spare parts and documents you purchased ac-
cording to the packing list. If you have any
question, please contact with the dealer.
Package materials such as plastic, PBV, nail,
screw, timber and carton must be placed into
a scrap bin to treat according to the local regu-
C
P
F
E N G L I S H •
lation.
INSTALLATION
Remove the connect bolt. And carry down the
wheel balancer to place it on the flat and solid
floor. We should store it indoor to avoid it from
being exposed to the sunlight for long time
and the moisture.
MACHINE INSTALLATION
LOCATION
The machine must be located in the working
environment and the ground should be solid.
Sockets that match the power supply and
motor power are available nearby.
Space for installing is big enough to meet the
needs and ensures each part of the machine to
work normally.
Put up a shelter if placed outdoors.
INSTALLING PARTS
Shaft . Take out the threaded end and bolts
from the accessory case.
Mount the cone on the corresponding arm.
Mount the guard according to Appendix I.
ELECTRICAL CONNECTION
Put the plug in the socket to finish installing
the balancer.
According to the label on the connect between
power cable and body, the power cable con-
nect socket must be grounded with the reliable
earth wire.
All the electrical devices installation must be
done by the qualified staff. Before installation,
please check If the power system is comply
with the technical parameter marked on the
nameplate of the machine.
The wiring of the machine must have the fuse
and the perfect ground protection. And in-
stall the electrical Leakage automatic controls
switch in the power source. And recommend
the application of the stabilizer if the voltage
of installation site is unstable.
WARNING: Any electrical connect in the
workshop is only done by the qualified techni-
U s er 's M an u al
21
Tabla de contenido
loading

Tabla de contenido