Eaton 9130 Guia De Instalacion página 10

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 216
INSTALLATION
10
EATON 9130 (9910-E15/E16) UPS Installation Guide for IBM
A small amount of arcing may occur when connecting the internal batteries. This is normal
and will not harm personnel. Connect the cables quickly and firmly.
2.
Connect the internal battery connector (see Figure 2).
Connect the white connectors together, connecting red to red, and
black to black. Press the two parts tightly together to ensure a
proper connection.
Figure 2. Connecting the UPS Internal Batteries
3.
Remove the two screws from the screw mounts and retain (see
Figure 2).
4.
Place the battery connector between the screw mounts. Reinstall
the two screws to hold the connector in place.
5.
Replace the UPS front cover.
To replace the cover, verify that the ribbon cable is protected, then
insert the clips on the back of the cover into the cabinet and push
firmly to snap the cover into place.
C A U T I O N
S
®
Applications
164201783 Rev 2
Tabla de contenido
loading

Este manual también es adecuado para:

9910-e159910-e16

Tabla de contenido