Victoria Arduino ATHENA Serie Manual Técnico De Empleo página 23

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

the machine if the self-level is inserted more
than 90 seconds. If this happens it is anyway
enough to switch the machine off and then
switch it on again, to complete the boiler's loa-
ding).
To carry out the manual filling, before swit-
1
ching the machine on, turn the manual loading
tap 2 that is below the worktop.
Once the boiler is half filled, turn again the
manual loading tap 2 and switch the machine
on in order to activate the automatic level, in
addition you should check that the tap 3 of the
self-level is turned open.
Remark: a tap is turned open when turning the
lever it is parallel to the tap's body.
After about 20 minutes the machine will have
reached the working pressure that can be noti-
ced and taken from the double scale manome-
ter. To change the working pressure of the boi-
ler, (and also its temperature) according to the
2
21
Tabla de contenido
loading

Este manual también es adecuado para:

Athena 2 gruppiAthena 3 gruppi

Tabla de contenido