Operating
Starting the welding process
• Fit the required welding shoe (5) according to the paragraph "Change of welding
shoe" (see page 6).
• Welding can begin once the operating temperature has been attained. Operate
the drive on/off switch (4) for this purpose. Operate the tool only when feeding
welding rod.
• Feed welding rod of 3 or 4 mm diameter into the welding rod opening (6) and
allow a small amount plastizised material to escape.
• CAUTION! Never feed welding rod into both welding rod openings at the
same time! (see "Starting protection").
• The welding rod fed must therefore be clean and dry.
• The extrusion rate can be changed using the extrusion rate regulation potentio-
meter (7) dependent on the seam geometry and the choice of material.
• Interrupt material extrusion using the drive on/off switch (4).
• Direct the pre-heating nozzle (21) to the welding zone.
• Pre-warm the welding zone with back and forth movements.
• Position the tool on the prepared welding zone and operate
the drive on/off switch (4).
• Carry out test welding and analyse.
• Adjust the hot air temperature using the air temperature potentiometer (2) and the
extrusion rate with the extrusion rate regulation potentiometer (7) as required.
• In case of a prolonged welding process, the drive on/off switch (4) can be held in
the active state with the locking device (3).
• The welding rod is pulled in through the welding rod opening (6) automatically
after starting. The welding rod pull - in must not be impeded.
Switching off
• Release the locking device (3) by briefly pressing the drive on/off switch (4) and
then letting go. Remove welding material from the welding shoe in order to avoid
damage on the welding shoe when starting the next time.
• The tool must only be laid down on the tool rest (8) (see pg. 12, centre fig.).
• Use a fireproof base.
• The hot air jet must not be directed towards persons and objects.
• Adjust the air temperature potentiometer (2) to "0". Let the tool cool down.
• Switch off at the hot air blower switch (1).
Checking the temperature of the extruded material and the pre-heating
temperature
• The temperatures of the extruded material and the hot air jet are to be checked
at regular intervals when carrying out welding work over an extended period:
Fast display electronic temperature measuring devices with the appropriate
temperature probes have to be used. The highest temperature in the hot air jet
between the nozzle outlet plane and a depth of 5 mm is to be determined. The
measurement probe must be inserted in the welding shoe in the middle of the
extruded material to measure its temperature.
14
21
Tabla de contenido
loading

Productos relacionados para Leister FUSION 2

Este manual también es adecuado para:

Fusion 3cFusion 3

Tabla de contenido