Factory Settings; Installation; Dhc 6, Dhc 8 - Stiebel Eltron DHC Serie Operación E Instalación

Minicalentador de control hidráulico
Ocultar thumbs Ver también para DHC Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 45

INSTALLATION

Installation
Undersink installation DHC 6 U
9.2

Factory settings

The appliances are prepared in the delivered condition:
DHC 3, DHC 4, DHC 6, DHC 8
- Power supply from above; installation on unfinished walls
- Water connection, installation on unfinished walls
DHC 6 U
- Power supply from below, installation on finished walls
- Water connection, installation on finished walls
10. Installation
Note
f Mount the appliance on the wall. The wall must pro-
f
vide sufficient load-bearing capacity.
This chapter describes installations in accordance with the factory
settings.
For further installation options for the DHC 3, DHC 4, DHC 6 and
DHC 8 appliances, see chapter "Alternative installation options".
f Undo the cover fixing screw by two turns.
f
f Remove the appliance front cover towards the front.
f
20
| DHC
DHC 3, DHC 4,
DHC 6, DHC 8
1 Power supply from above
2 Water connection on unfinished walls
f Cut or break out the required entries in the appliance back
f
panel cleanly. If necessary, use a file.
DHC 6 U
1 Power supply from below
4,5 - 5,5
1
2
1
4 x 35
6,0
www.stiebel-eltron.com
Tabla de contenido
loading

Este manual también es adecuado para:

Dhc 3Dhc 4Dhc 6Dhc 8Dhc 6 u

Tabla de contenido