Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 71

2-2. KGK kurulumu

Before installing the UPS, please read below to select proper location to install UPS.
1.
UPS should be placed on the flat and clean surface. Place it in an area away from vibration,
dust, humidity, high temperature, flammable liquids, gases, corrosive and conductive
contaminants. Install the UPS indoors in a clean environment, where it is away from
window and door. Maintain minimum clearance of 100mm in the bottom of the UPS to
TR
avoid dust and high temperature.
2.
Maintain an ambient temperature range of 0ºC to 45ºC for UPS optimal operation. For
every 5ºC above 45ºC, the UPS will derate 12% of nominal capacity at full load. The
highest working temperature requirement for UPS operation is 50ºC.
3.
It's required to maintain maximum altitude of 1000m to keep UPS normal operation at full
load UPS. If it's used in high altitude area, please reduce connected load. Altitude derating
power with connected loads for UPS normal operation is listed as below:
4.
Place UPS:
It's equipped with fan for cooling. Therefore, place the UPS in a
well-ventilated area. It's required to maintain minimum clearance of 100mm
in the front of the UPS and 300mm in the back and two sides of the UPS for
heat dissipation and easy-maintenance.
5.
Connect To Transformer
Please do NOT connect transformer to output of the UPS. Otherwise, it will cause UPS internal
fault and force UPS to enter to fault mode. Please connect transformer to input of the UPS.
6.
Connect to External Battery Pack
When connecting external battery packs, please be sure to connect polarity correctly. Connect
positive pole of battery pack to positive pole of external battery connector in UPS and negative
pole of battery pack to negative pole of external battery connector in UPS. Polarity
Transformer
4
Transformer
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

1500 lcd2000 lcd3000 lcd

Tabla de contenido