Positioning The Housing; Cable Route; Installation Of The Housing - FAAC Night ONE Day Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

9

POSITIONING THE HOUSING

9.1

Cable route

1)
Route the cable through the cable sleeve.
2)
Fit the cable sleeve in the hooking point
on the frame at the cable exit.
9.2

Installation of the housing

1)
Position the housing and the covering side panels on the frames.
2)
Push them vertically until you hear a "click".
"CLICK"
1.
Cable sleeve
2.
Hooking point for cable sleeve
1

2
Fig. 29
"CLICK"
Fig. 30
Tabla de contenido
loading

Tabla de contenido