Phasak PH 9360 Manual Del Usuario página 75

Ocultar thumbs Ver también para PH 9360:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Step 7.​ Rack/Tower Installation
Tower Installation
● The UPS system is shipped with two sets of feet and 6 extensions (2 short
extensions plus 4 long extensions) that can be used to tower install the UPS
module in 2U or UPS module with one battery bank in 4U. I
Install UPS module in 2U
● Assemble two feet and one short extension as one tower stand shown in step 1.
Align the two stands approximately 35 cm apart in step 2. Then, put UPS module
in the stands as shown in step 3.
​ ​ S tep 1​
Install UPS module and one battery bank in 4U
Assemble two feet and two long extensions as one tower stand shown in step 1.
Align the two stands approximately 35 cm apart in step 2. Then, put UPS module
and battery bank in the stands as shown in step 3​ .
​ ​ S tep 1​
ON-LINE RACK
​ S tep 2​
​ S tep 2​
P H 9360 - PH 9301 .
​ S tep 3
​ S tep 3
74 / 100
Tabla de contenido
loading

Este manual también es adecuado para:

Ph 9301

Tabla de contenido