Installation
4
Wood Frame
Cadre en bois
Estructura de madera
Measure the cabinet opening where the sink will be installed. Plan for adequate
clearance between the faucet handles and the backsplash or finished wall.
Construct a wood frame for the inside of the cabinet. Allow adequate clearance for
the faucet valving and sink bowl. Ensure the frame will support the entire sink
rim.
IMPORTANT! The frame should be located so that once the sink is installed, the top
of the sink rim will be flush with the top of the cabinet walls.
Position the wood frame within the cabinet and secure. Locate the fasteners for
easy access in case the sink needs to be removed.
Apply a 1" (25 mm) bead of sealant at each corner of the wood frame where it
will contact the sink.
Installation
Mesurer l'ouverture du meuble où l'évier sera installé. Prévoir suffisamment de
dégagement entre les poignées du robinet et le dosseret ou le mur fini.
Construire un cadre en bois pour la partie intérieure du meuble. Laisser un espace
adéquat pour les vannes de robinet et la vasque de l'évier. S'assurer que le cadre
supporte le rebord de l'évier au complet.
IMPORTANT! Le cadre doit être positionné de manière à ce qu'une fois l'évier
installé, le dessus du rebord de ce dernier soit à ras du dessus des murs du meuble.
Positionner le cadre en bois dans le meuble et le fixer en place. Positionner les
dispositifs de fixation pour un accès facile dans l'éventualité où l'évier devrait être
retiré.
Appliquer un boudin de mastic d'étanchéité de 1" (25 mm) sur chaque coin du
cadre en bois qui touche l'évier.
1130284-2-E
Apply silicone sealant.
Appliquer du mastic à la silicone.
Aplique sellador de silicona.
Clearance for the Sink Basin
Dégagement pour cuve d'évier
Espacio libre para el fregadero
8
Kohler Co.