Technical Assistance; Materials Needed For Installation; Materials For All Installations; Recommended Materials For Installations - Zodiac Jandy EE-Ti Manual De Instalación Y Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Zodiac
®
Jandy
1.5

technical assistance

Consult the Zodiac technical support department
or your local Zodiac dealer with any questions or
problems involving the specifications, installation, and
operation of your Zodiac equipment. An experienced
technical support staff is ready to assist you in assuring
the proper performance and application of Zodiac
products. For technical support call the Zodiac technical
support department at (800) 822-7933.
1.6

Materials needed For installation

1.6.1

Materials for all installations

The following items are needed and are to be
supplied by the installer for all heat pump installations:
1.
Plumbing connections (2").
2.
Level surface for proper drainage.
3.
Suitable electrical supply line. See rating plate on
unit for electrical specifications. A junction box is
not needed at the heat pump; connections are made
inside of the heat pump electrical compartment.
Conduit may be attached directly to the heat pump
jacket.
note Flex conduit is recommended for connecting
the electrical supply wires to the heat pump so
that the front panel may be removed easily for
servicing.
4.
Electric cutout switch that will interrupt all power
to the unit. This switch must be within line of sight
of the heat pump.
5.
Watertight conduit to run the electrical supply line.
1.6.2
recommended Materials for
installations
Zodiac recommends installing isolation valves
on the inlet and outlet water connections for ease of
serviceability.
1.7

specifications

1.7.1

General specifications

Suitable for indoor and outdoor use. Clearances
shown in Table 2 must be adhered to.
Water pipe/Heater Connection
Plastic
Flow rate
Maximum
Optimum
Minimum
Note: If a flow switch is installed (R0509700), do not
exceed 92.5 gpm (350 lpm). Exceeding the maximum flow
rate can damage the flow switch.
Maximum Working Water
pressure
|
®
Heat Pumps Model EE-Ti
Installation and Operation Manual
2" PVC (Unions included)
125 gpm (475 lpm)
60 gpm (230 lpm)
30 gpm (114 lpm)
75 psi
ENGLISH
electrical supply
Voltage Requirements
1-Phase
3-Phase
Maximum Working refrigerant
pressure
1.7.2

dimensions

See Figure 1 for heat pump's dimensions and for
dimensions to critical connections.
1.7.3

technical specifications

See Table 1 for the EE-Ti Heat Pump Technical
specifications.

section 2. installation instructions

2.1

General information

Install the Zodiac heat pumps in accordance
with the procedures in this manual, local codes and
ordinances, and in accordance with the latest edition of
the appropriate national code. (See Section 1.4, "Codes
and Standards".) Correct installation is required to
assure safe operation. The requirements for Zodiac heat
pumps include the following:
1.
Field assembly (if required).
2.
Appropriate site location and clearances.
3.
Sufficient air ventilation.
4.
Proper electrical wiring.
5.
Adequate water flow.
This manual provides the information needed to
meet these requirements. Review all application and
installation procedures completely before continuing the
installation.
2.2

location requirements

2.2.1

introduction

note Indoor installations require special
considerations for condensate drainage and
venting the cold air produced by the heat
pump. Contact the Zodiac technical support
department at (800) 822-7933.
Caution
When pool equipment is located below the pool
surface, a leak from any component can cause
large scale water loss or flooding. Zodiac cannot
be responsible for such water loss or flooding or
resulting damage.
Page 5
230 VAC 60Hz
230 VAC 60Hz
(Model dependent)
650 PSI
Tabla de contenido
loading

Tabla de contenido