Miele professional PG 8083 Plano De Instalación página 5

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 6
5. Voltage (standard version)
It is always recommended to make electrical connection via a
plug and socket so that electrical safety checks, e.g. during
repair or service work, can be carried out easily. The socket
must be accessible after machine installation. A fixed
electrical connection is possible via an on-site main switch
providing complete isolation from the mains for all poles. The
contact gap must be at least 3 mm. If necessary, equipotential
bonding with good galvanic contact must be guaranteed in
compliance with all applicable local and national installation
codes.
Cold water or
Max. water hardness
Hot water
Minimum flow pressure
Maximum pressure
Flow rate
On-site threaded union in accordance with DIN 44991 (flat
sealing)
Length of connection hose (included)
Hot water connection, max.
This commercial dishwasher is DVGW approved.
Connection to a drinking water supply is permissible without
an additional non-return device.
Waste water
Drain hose (internal dia. x wall thickness x length)
Max. drain pump head height from base of machine
Max. transient flow rate per drain hose
On-site hose sleeve for drain hose (outer dia. x length)
Machine data
Undercounter height
Width
Depth
Installation should only be performed by qualified fitters in accordance with valid regulations, relevant standards and health
and safety codes!
It is important to comply with installation instructions when installing machines! Only use commercial grade cabinetry in the
vicinity of this commercial dishwasher as condensate may otherwise cause damage. All rights reserved! Dimensions in mm.
Change no.
Date
A19564
2012-12-12
A031504
2014-04-17
A41971
2016-02-08
A10001389
2016-11-18
Installationsplan PG 8083
Stand: 15.09.2017
Rated load
Fuse rating
Connection cable, min. gauge
Connection cable length with
plug
Voltage (standard version)
Rated load
Fuse rating
Connection cable, min. gauge
Connection cable length with
plug
Voltage versions
Change in the voltage versions
+ TR
600 mm  570 mm
V/Hz
AC 120/208-240/60
kW
3.5-4,2
A
2 x 30
AWG
10/4
m
1.8
V/Hz
AC 120/60
kW
1.5
A
15
AWG
14/3
m
1.7
°dH
36
kPa
30
kPa
1000
l/min
6.0
Inch
3/4" male thread
(USA: 11.5 NH)
mm
1500
°C
60
mm
22 x 6 x 1500
m
1.0
l/min
16
mm
22 x 30
mm
845
mm
598
mm
570
Designation:
5
Tabla de contenido
loading

Tabla de contenido