Sammic LV-900 Manual Del Usaurio página 4

Tabla de contenido
LV-900 / E-1000 / LV-1100 / LV-1200
MODELS
This manual describes the installation, operation and maintenance of
the LV-900, E-1000, LV-1100 and LV-1200 machines.
The model reference and its specifications are shown on the identifi-
cacion plate located in the machine.
These machines have been designed and manufactured in accordan-
ce with the following European directives: 89/392/EEC and
73/23/EEC.
INSTALLATION
For a suitable working operation and long service life of the machine,
follow the instructions contained in this manual.
Water connection
Subject to inlet water supply at 55ºC. Before proceeding with the ins-
tallation of the machine, check and make sure that:
1.-The mains water connection is within 1,50 m of the foreseen loca-
tion of the glasswasher machine.
2.-The water supply connection is equipped with a 3/4" GAS stopcock
for cutting off the water supply and its end is the nearest possible to
the machine.
3.-The constant pressure of the water supplied to the machine is not
lower than 2 bars and not higher than 4 bars.
4.-For good washing results, the hardness of the water must not exce-
ed 10º hydrometric degrees.
Switch
Rinse aid
container
Green lamp
Timer
control
Main switch
Rinse
aid doser
Red lamp
Booster pump
LV-900
Pressure
reducer
Water softener
5.-In places where the water pressure is higher than 4 bars, it will be
necessary to incorporate a pressure reducer.
6.-If the water pressure is lower than 2 bars it will be necessary to
incorporate to install a pressure lifter.
7.-Avoid bottlenecks with hoses when making this installation.
Simple installation
After all the above specifications have been complied with, screw the
3/4" connection hose supplied with the machine on to the stopcock or
the pressure reducer. In case that a pressure reducer has been incor-
porated check the point 3 in former section.
Machine installation with s water softener
If the lime content of the water is higher than 10º hydrometric degre-
es, install a SAMMIC water softener. The installation instructions of
this device come with it.
Avoid bottlenecks before and after this installation as flow would be
reduced producing loss of pressure.
Machine installation with a booster pump
In the case of the water pressure being lower than 2 bars, install a
booster pump.
Switch
Rinse aid
container
Green lamp
Timer
control
Rinse
aid doser
Main
switch
Red lamp
Booster pump
4
E-1000
Pressure
reducer
Water softener
Tabla de contenido
loading

Este manual también es adecuado para:

E-1000Lv-1100Lv-1200

Tabla de contenido