Brinly DTZ-48BH Manual Del Propietário página 9

Aireadora de montaje frontal para cortadoras de césped de giro cero
Ocultar thumbs Ver también para DTZ-48BH:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

================================================================================================
Figure 8.
15
39
1/2" x 2" Hex Bolt
Qty. 2
Slide the large pivot bracket (15) over the tube with decal (6).
Slide the small pivot bracket (18) over the fixed arm (17)
Clamp both pivot brackets in place using the hardware as shown.
The pivot brackets can be identified as follows, pivot bracket (15) has 6 holes in the
u-shaped mounting tab and pivot bracket (18) has 4 holes.
NOTE: Be sure to install the spacer (28) between the upright plates on the pivot
brackets (15) and (18). Hold the spacer in place with the 1/2" x 2" hex bolt (39)and
1/2" nylon lock nut (9), do this for each pivot bracket.
NOTE: Do not tighten the 5/16" nylon nuts (13) down completely because the pivot
brackes may need to be moved to fit up with the front mount (20) after the
dethatcher is mounted (see Fig 9)
Figure 9.
37
Hairpin Cotter, 1/8"
Qty. 2
Adjust the pivot brackets (15) and (18) so that they will match up with the front mount
brackets (20), make sure that the dethatcher is centered to the formt of the ZTR
The front mount brackets (20) and the dethatcher assembly must be level, adjust the
height of the front mount brackets in relation to the holes in the pivot brackes (15) and
(18) when the unit is level then install the 1/2" x 1" clevis pin (35) in both sides and secure
with the hair pin cotter (37).
NOTE: The pivot brackets (15) and (18) can be flipped 180 degrees for more adjustment.
18
Support Frame assembly
Dethatcher assembly
20
ASSEMBLY
6
14
14
5/16" x 2-3/4" Hex Bolt
Qty. 4
17
28
13
39
9
1/2" Nylon Lock Nut
Qty. 2
15
35
35
35
Clevis Pin 1/2" x 1-1/4"
Qty. 2
1009719 Rev E
13
5/16" Nylon Lock Nut
Qty. 4
9
18
20

Capítulos

Tabla de contenido
loading

Tabla de contenido