Preparation Of The Base For Automation - V2 NIUBA-24V Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4 - PREPARATION OF THE BASE FOR
AUTOMATION
1. Provide a foundation pit and arrange one or more conduits for
the passage of the electrical cabling (FIG. 1).
2. Assemble the 4 anchoring brackets on the mounting plate and
fasten with the 8 bolts provided (FIG. 2).
3. Pour the concrete into the inside of the pit and position the
base plate
m
NOTE: verify that the plate is perfectly leveled and
parallel to the opening barrier
4. Wait for the complete setting of the concrete
5. Unscrew the 4 nuts that hold the base joined to the anchoring
brackets and position the rack on the plate (FIG. 3).
NOTE: it is advisable to install the rack cabinet with the
inspection access flap turned towards the more accessible
side
FIG. 1
FIG. 2
60mm
- 39 -
FIG. 3
Tabla de contenido
loading

Este manual también es adecuado para:

Niuba4-230vNiuba6-230v

Tabla de contenido