•
Fill reservoir with water-glycol mixture until the maximum level is reached. (water quality and treatment should be established
according to the application specifications)
•
Connect water inlet and outlet pipes and make a visual inspection.
•
Establish main power feed and alarm cable with customer's equipment.
•
CHILLER with pump: Purge pumps by loosening purging screw that is located on the side of pump. Be advised that the pump
has been purged correctly when only water is visible.
English
Picture 11 / 12 – Filling process and max level
Picture 13 – Pipe connection
Picture 14 – Electrical connections
15