GEA Grasso 5HP Manual De Instalación Y Mantenimiento página 54

Compresores alternativos para refrigeración industrial
Ocultar thumbs Ver también para Grasso 5HP:
Tabla de contenido
APÉNDICE; Información de los productos (IP)
2.
3.
4.
Pre-lubrication procedure
Location pre-lubrication valve, refer Figura 14, Página 54/ Figura 15,
Página 54
1.
2.
Fig.14:
6
Fig.15:
6
54
Before start-up after overhauling compressor
Before start-up after renewal of oil
Before start-up after standstill period of more than 1 month
Top up crankcase to the minimum required oil level
Connect oil filling pump to stop valve and top up oil to 50-75% level (Hand
operated oil filling pump can be supplied by Grasso)
Grasso 5HP
Pre-lubrication valve
Grasso V
Pre-lubrication valve
0089505esp_Pre-release_8
22.03.2017
Tabla de contenido
loading

Tabla de contenido