Checking For Correct Ventilation; Pipe For Gas Connection; Electric Connection; Equipotential - Lotus PC-94G Guia Para La Intalación E Instrucciones De Uso

Cocinas a gas para uso profesional
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

in a well ventilated room, preferably under an extractor hood, so as to ensure the complete extraction of gas
emissions which are formed during combustion. The air necessary for combustion is 2m3 /h per kW of power
installed.
Attention! In accordance with international rules, when connecting the appliance, an automatic device enabling the
disconnection of all contacts from the mains, must be installed above it; this device must have a contacts opening of at
least 3 mm.
Ensure that the air outlets in the place of work are sufficient to guarantee the necessary air exchange, as stated in
paragraph 4.3 of the UNI-CIG. norm 8723.
The appliance may be installed as a single element or in series with other appliances of our production. It is necessary to
observe a minimum distance of 10 cm from the appliance to prevent contact with walls of inflammable material;
adequate measures must also be taken to ensure thermal insulation of inflammable parts, such as the installation of a
protection against radiation; particular attention must be paid in installing the appliances adequately and safely. The feet
are adjustable in height so that differences in level can be avoided.
We remind you that appliances installed in buildings for public use must meet the following requirements:
In Italy:
1)
Installation regulations
Installation and maintenance of the appliance must be carried out following the correct procedures and written
regulations in use, in particular:
safety norms against fire and panic in public buildings
a)
general instructions
-
For all appliances:
the connection, installing the system and appliances, ventilation and fumes extraction system must be done in
accordance with the manufacturer's instructions by professionally specialised personnel in compliance with the
UNI-CIG norm 8723. The electrical part must comply with the E.C.I. norms in force; furthermore, the current rules
established by the Fire Brigade must be observed.
In Switzerland:
The appliance must be installed in accordance with the safety norms in force.
Installation, conversion and repairs of appliances for professional use, as also the withdrawal for breakdowns and gas
supply connections may be carried out only on the base of a maintenance contract drawn up with an authorised sales
agent and observing the technical norms.
The gas connection must be done with steel or copper pipes, or otherwise with flexible steel pipes in compliance with
the national norms, if any exist. Each appliance must be provided with a cut-off cock for rapid interruption of the gas
supply. Once the appliance has been installed, it is necessary to check for gas leaks for the pipe fittings; do not use a
flame for this purpose but a non-corrosive substance such as soapy water or foamy substances as contained in leak-
finder sprays. All our appliances undergo careful testing: the type of gas, the operating pressure and the category are
indicated on the data plate.
NB: The year of the appliance manufacture is shown in item "N" on the data plate. The first two numbers (e.g. 93..)
represent the year of manufacture.
The appliance is supplied without the connection cable; to install it, proceed in the following way:
-Remove the back panel
-Push the connection cable through the cable channel, connect the conductor wires to the corresponding terminals in the
junction box and fix them into place.
-Block the cable with the cable blocker, and reassemble the panel. The earth wire must be longer than the others so that
if the cable blocker should break, it will disconnect after the tension wires.
N.B. The connection cable must have the following characteristics: it must be type H05RN-F and must have an
adequate section for the power of the appliance(see technical data table).
The appliance must be connected to an equipotential system.
GB
IT

CHECKING FOR CORRECT VENTILATION

PIPE FOR GAS CONNECTION

ELECTRIC CONNECTION

EQUIPOTENTIAL

IE
CH
42
Tabla de contenido
loading

Tabla de contenido