Section 3 Operation; Initial System Start-Up; Normal Operation - Del ozone Eclipse EC-10 Manual De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Eclipse Installation & Operations Manual
provides a wide operating range. If more gas flow is necessary,
verify that other valves in the system are not inhibiting flow through
the Manifold. If you experience complications see TROUBLE
SHOOTING Section 4D.
7. After the system has been set for the correct flow rate. Remove
the Flow Meter Assembly and connect the remaining end of the
Ozone Tube to the Ozone Outlet Barb on the DEL Eclipse unit
with the tube clamp provided. Cut off the excess tubing so that
the line from the injector to the DEL Eclipse is as straight and
free from dips and loops as possible.

SECTION 3 Operation

3A. General
To achieve optimal performance from the ozone system, the pool
must be as clean as possible to start with.
1. Backwash or clean filters one day before starting the ozone
generator.
2. Superchlorinate pool water using a chlorine based shock
treatment prior to ozone system start-up.
3. Test pool chemistry and adjust pH between 7.4 and 7.6. Adjust
total alkalinity between 80 and 120 ppm.
4. Run pool filtration continuously for 24 hours prior to starting
ozone system.
3B. Initial System Start-Up
Upon completing all of the generator system connections and
cleaning the pool as outlined above, you are ready to start the
ozone generator.
1. Check electrical connections.
2. Check for proper voltage.
3. Turn on pool circulation system.
3C. Normal Operation
1. Indicator Lights: When the pool's circulation system starts, the
Eclipse will power up and the green indicator lights on the ozone
cells will illuminate. Open the Enclosure Door to verify that all
indicator lights are green. The EC-10, EC-20, and EC-40 should
show 2, 4, and 6 indicators, respectively.
6
Tabla de contenido
loading

Este manual también es adecuado para:

Eclipse ec-20Eclipse ec-40Eclipse serieEc-10Ec-20Ec-40

Tabla de contenido