2
Installing the base (cont'd)
STEP
B3
Verify that the base is completely level on all sides. Confi rm that
the drain pipe is centered in the drain head. We recommend a
plumber to complete the drain pipe connection.
If needed use wooden shims between the studs and
the fastening fl ange to maintain the position of the
base.
FOR B3 BASES YOU MAY USE SHIMS UNDER
THE BASE TO LEVEL (UNDER THE BASE LEGS
IDEALLY)
With a 1/8" bit, drill holes in the fastening fl ange then
secure the base to all the wall studs with #8 x 1¾ "
screws (not included). Only pre-drill the flange not
the studs.
HAND TIGHTEN ONLY !
THE BOTTOM OF ALL HOLES IN THE FLANGE
HAVE TO BE AT LEAST 8MM (0.3 INCHES) ABOVE
THE BASE THRESHOLD!
CUT SHIM EXCESS
Leveling the base is critical
for wall alignment
COMPATIBLE BASES
B3 Square 4832
B3 Round 4832
B3 Square 4836
B3 Round 4836
B3 Square 6032
B3 Round 6032
B3 Square 6036
B3 Round 6036
2.3
Check me!
Shims and
cement under
to level B3
2.4
Check me!
2.5
Check me!
0.3" (8 mm)
Ø 1/8"
9
No.
420001-5XX
410001-5XX
420003-5XX
410003-5XX
410005-5XX
410005-5XX
410006-5XX
410006-5XX
13
bases
13
13