2- Hole Drilling; 4- Indoor Unit Electric Connection - Farelek 112503 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

E2- hole Drilling :
• locate the outside way of the copper pipes according to the support.
WARNING ! After the unit support fixation, be sure that the hole will be hidden.
• Drill a 65 mm diameter hole using a trepan in order to put the wires trough the wall.
E3- 3- Indoor unit Depressurization :
•The internal unit is filled with air under pressure. This air will escape when the caps are taken off. This does
not present a danger, but nonetheless a strong force is required when unscrewing the screws.
• WARNING ! Do not destroy the tube during this operation.
E4- indoor unit electric connection :
• Unscrew on this two points the frontal panels.
112503-112511-new.indd 38
(except 112495: Gaz pre load model)
• with flat key ( 22 and 17 ), Lose the nuts in or-
der to bleed the air . However, unscrew lightly the
nuts .
© FAR GROUP EUROPE
en
B
18/12/07 16:52:39
Tabla de contenido
loading

Este manual también es adecuado para:

112511

Tabla de contenido