(Wet Or Gel) Battery Setting, Installation And Charging - Clarke Vantage 17 Battery Libro De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ENGLISH
(WET OR GEL) BATTERY SETTING, INSTALLATION
AND CHARGING
The electrical board of the machine is to be set according to
the type of batteries installed, either gel (GEL) or lead (WET).
Proceed as follows:
Machine Setting
1.
The machine factory setting is for GEL batteries; if this
setting corresponds to the type of batteries bought, go to
step 5. Otherwise, carry out steps 2, 3, and 4 too.
2.
Remove the screws (A, Fig. 7) and carefully pull out the
electrical component box cover (B).
3.
Push the microswitch (C, Fig. 7) downwards to WET
position.
WARNING!
Do not move the adjacent switch (D, Fig. 7).
4.
Reinstall the electrical component box cover (B, Fig. 7) and
tighten the screws (A).
Battery Installation
5.
Disconnect the vacuum hose (A, Fig. 8) from the squeegee
(B).
6.
Disconnect the recovery tank drain hose (C, Fig. 8) from the
bracket (D).
7.
Open the cover (A, Fig. 9) and apply the cover stand (B).
8.
Grasp the recovery tank (C, Fig. 9) in the area (D) and lift
it, as shown in the figure, then disconnect the vacuum hose
(E) from the tank and remove the tank (C) together with the
hoses (F) and (G).
9.
Install the batteries on the machine according to the diagram
(E, Fig. 8).
10.
Reinstall the tank (C, Fig. 9) by carrying out steps 5 to 9 in
the reverse order.
Battery Charging
11.
Charge the batteries (see the relevant procedure in the
Maintenance chapter).
12
Figure 7
Figure 8
Figure 9
Operator's Manual - Vantage 17 Battery
Tabla de contenido
loading

Tabla de contenido