Mounting Steps - Lenze L-force Drive E94AZMR0264DB Serie Instrucciones Para El Montaje

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

6.4

Mounting steps

How to connect the filter:
1. Connect the following cables to the installation backplane of the regenerative
power supply module; observe documentation of the regenerative power supply
module.
– Filter output cable X321
– Filter output cable X322
– Control cable X324
2. Connect 24−V DC voltage source to terminal X323
– Use safely separated power supply unit (SELV/PELV)
3. Connect mains cable to terminal X320.
4. Mount PE conductor on the supply side with fork−type or ring cable lug M5 to the PE
conductor screw.
– PE connection must comply with EN 61800−5−1 .
EDK94ZMR47XDB DE/EN/FR/ES/IT 4.0
Electrical installation
l
Mounting steps
E94AZMR003
6
49
Tabla de contenido
loading

Este manual también es adecuado para:

L-force drive e94azmr0474db serie

Tabla de contenido