Seko PROMAX Manual De Instrucciones página 6

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

ProMax – Proportioning System
INSTALLATION OF A MULTIPLE UNIT :
Step 1A
2
To install a multiple unit system,
start by installing the first bracket
on the wall as illustrated in Step
1. Then slide the second bracket
into the slot from top to bottom
on the left side of bracket 1 until
they are properly aligned and
secure..
Step 4A
Insert the coupling nipple into the
first unit as illustrated
ProMax
Step 2A
1
Unlock the left side of the first
system by pulling the rear clip to its
outward most position as shown and
remove the end cap.
Step 5A
Connect the second unit to the first
Cod. 0000137667
Step 3A
Unlock the right side of the
second system by pulling
the clip to its outward most
position and remove the
water connection.
Step 6A
Apply the combined
system on to the bracket
and complete the
installation as per step
number 3 above.
rev. 1.5
EN
4

Hide quick links:

Tabla de contenido
loading

Tabla de contenido