Bergstrom FLEX POWER II Instrucciones De Montaje página 33

Ocultar thumbs Ver también para FLEX POWER II:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FLEX POWER II
PIPE ASSEMBLY
Run 3/8" pipe from the evaporator to the
8
condenser unit, secure 90º male coupling and
mount in the dryer filter.
Caution: pass the pipe through along with the
original pipes or cables, avoiding any sharp
areas and constrictions, and secure with cable
ties.
Connect the supplied cable in the pressure
9
switch and electro, and secure as indicated.
9
Secure the most suitable coupling (90º or
10
straight) in 1/2" pipe and mount the condenser.
10
33
8
9
10
EN
Tabla de contenido
loading

Tabla de contenido