Cable Entry - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

2  Installation
7. All conductors must be correctly attached with the
correct torque. See Section 5.4, page 43.
Figure 2.17 Protective conductor symbol
LEAKAGE CURRENT HAZARD
Insufficient grounding of the inverter can lead to serious
injuries or lethal injuries.
• Ensure the correct grounding of the devices by a
certified electrical installer.
Terminal
AC+PE
PV
Table 2.1 Suitable conductor sizes
1)
Always observe the ampacity of cables used.
26
SHP75-10-IA-xx-15
1)
Range
35 to 150 mm²
35 to 150 mm²

2.7 Cable Entry

The mounting brackets for the cable glands are already
pre-mounted.
Figure 2.18 AC cable gland
Figure 2.19 DC cable gland
Conductor material
Al/Cu
Al/Cu
SMA Solar Technology AG
Cable sheath diameter with supplied
cable gland
46 to 53 mm
18 to 25 mm
Installation Guide