Cable Routing; Front Mounted Units; Back Mounted Units - Sperian Miller DURAHOIST Serie Instrucciones De Uso

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7.3.2 Cable Routing

7.3.2.1 Front Mounted Units

1
Insert cable through the bottom of
the mast head.
2
Pull cable through to the top of the
mast head.
3
Insert cable into opening above
bottom pulley.
4
Pull cable over bottom pulley.

7.3.2.2 Back Mounted Units

1
Insert cable through opening;
over pulley and under metal bar,
at the back end of the mast.
4
Pull cable over pulley.
USE R I N S TR U C TIO N S - E N G L I SH
1
3
2
Pull cable through opening,
stringing along mast arm.
5
Reinsert pin.
28
3
Remove pin on mast head.
2
4
Tabla de contenido
loading

Este manual también es adecuado para:

Dh-1Dh-2Dh-3Dh-4Dh-5Dh-6 ... Mostrar todo

Tabla de contenido