Section 2. Set Up; Installation Controlling Board Machine Connection - TECshow BEAMER STREAM Manual De Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Section 2. Set Up

Installation
Controlling Board
Machine connection
Installation
This machine should be mounted through the screw
holes of truss. Safety wire is a must to fix fixture well.
Make sure truss and safety wire have strong load capaci-
ty to bear 3 times weight than fixture at least.
This machine should be installed by qualified technician.
Controlling Board
1
1. Warning.
Minimum distance of inflammable materials from the surface
is 6m. Maximum temperature of the external surface is 80°C.
2. LCD Display.
Shows menu
3. Display Control Button.
Buttons: Menu, UP, Down, Enter
4. External Lamp Ignited.
This machine is with high voltage sodium lamp unit, needs
external igniter.
5. Operating Environment
Maximum operating environment temperature is 35°C,
the minimum distance of Inflammable materials from the
surface 6m.
6. CE Certification
This unit had obtained CE certification.
7. Indoor Used
This unit is for indoor used, can't bear moist or dusty
environment.
8. Treatment of Retirement
This unit can't be dropped to trash can.
BEAMER STREAM - 5R BEAM AND LASER SIMULATOR
ENGLISH VERSION
2
4 6 8
3
5 7
9 10
9. DMX In
Connect signal cable to let DMX signal input
10. DMX Out
Connect signal cable to let DMX signal output
11. Power Connector
Connect power cable to obtain power
12. Fuse
Protect machine from short circuit
13. Power Switch
Power on and off.
11 12 13
p. 5

Hide quick links:

Tabla de contenido
loading

Tabla de contenido