Festo HMPL Serie Instrucciones De Utilizacion página 29

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
HMPL-...
4. Push the flanged nut back into the non-rotating device and tighten the locking
nut again (tightening torque of the locking nut see table below).
Rated Æ Æ Æ Æ
Width across flats
X
Nm
Fig. 23
S
Tighten the two upstream one-way flow
control valves
– at first completely
– then loosen one turn.
S
Push the front plate by hand into the end
position.
At the same time you must press the man-
ual actuator for the clamping unit (only
with HMPL-...-KP). The clamping unit will
then be unlocked.
S
First pressurize the compressed air port:
– of the retracted end position E 8 on the HMPL-..., then
– on the clamping unit (only with HMPL-...-KP).
The moveable mass now moves completely into the end position against the
force of the shock absorber.
S
Check whether the desired endposition needs to be modified.
For precise adjustment of an end position:
S
Carry out the following steps:
1. Slowly pressurize the compressed air port
of the end position.
2. Remove the cover of the housing.
3. Loosen the locking nut of the stop el-
ement with an open-end spanner.
Festo HMPL-... 0005NH – English
HMPL-12-...
HMPL-16-...
10
13
15 mm
20 mm
2 Nm
3 Nm
HMPL-20-...
15
5 Nm
Fig. 24
Fig. 25
29
Tabla de contenido
loading

Tabla de contenido