Operation - PCE CHAUVIN ARNOUX Y7N Manual De Instrucciones

Pinza para oscilloscopios
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

3. OPERATION

Although there is no special hazard, do not clamp a conductor before
connecting the current clamp to the scope. Similarly, do not disconnect
the current clamp from the scope when the clamp is closed around a
cable.
Open the jaws and clamp the cable carrying the current to be measured.
Centre the cable using the marks. Observe the direction of the I arrow if
required by the application.
To read the measured current, apply the appropriate reading coefficient.
The current clamp delivers 1 mV~ for a current of 1 A~.
AC mains power
From 500 A to 700 A, limit the current clamp operating time: 10 minutes on
and 30 minutes off.
To scope
15
Load
Tabla de contenido
loading

Productos relacionados para PCE CHAUVIN ARNOUX Y7N

Tabla de contenido