Bosch Tronic 1000 Serie Instrucciones De Instalacion Y De Uso página 20

Calentadores eléctricos
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 47
Installation instructions
TR1000 6 B
High level appliance
TR1000 4 T
Under counter appliances
TR1000R 4 T
TR1000 5 T
TR1000 6 T
3
Installation instructions
Install the continuous-flow heater as described in the
illustrated section. Observe the instructions in the text.
3.1
Installation
I. Unpacking/scope of supply
Unpack the appliance and check for transport damage.
Dispose of the packaging and, where applicable, the old
appliance, in an environmentally conscious manner.
1
Housing
2
Mounting (2 screws, 2 wall plugs)
3
ON indicator (only on the TR1000 6 B)
4
Filter and sleeve (inserted in inlet)
5
Jet regulator and seal
6
Only for appliances with a permanent electrical
connection: Rubber grommet
3.1.1 Preparation for installation
CAUTION
Important!
Only use the enclosed installation set.
Shut off water supply. The electrical connection
(connection cable) must be disconnected from the power
supply. Unscrew the fuse or switch off the circuit breaker.
There must be a clearance of approximately 60mm on all
sides of the appliance for installation.
Observe the technical data for the appliance.
TR1000 5 T, TR1000 6 T, TR1000 6 B: Unscrew
the screws on the housing cover and remove the lid.
II. Wall mounting
Secure the appliance using the installation template,
screws and wall plugs so that it is vertical and flush against
the wall:
1
Locate the appliance on the screw and press down.
2
Screw in the second screw through the mounting
tab and tighten.
20
TR1000 5 T, TR1000 6 T, TR1000 6 B: For an exposed
electrical connection, the different methods of routing the
supply line found on the assembly template must be
observed.
TR1000 5 T, TR1000 6 T, TR1000 6 B: The sleeve must fit
tightly round the connection cable. If the sleeve is damaged
during installation, the holes must be sealed water-tight.
III. Water connection
A Pressurised connection
For a pressurized connection, the tap and outlet fittings
must be approved for operation with closed (pressurized)
continuous-flow heater system.
B Depressurised connection
Fit the jet regulator supplied.
Check the inserted filter and sleeve in the water inlet.
Ensure that the connection pipes are fitted to the adapter
along the axis of the pipes.
Tighten the union nuts firmly to the adapter with an open-
jawed spanner.
The T-piece and flexible connecting hose (for pressurised
connection) are available from a specialist store.
For a depressurised connection, a depressurised fitting must
be used, e.g. fitting BZ13051 which can be obtained as
a special accessory.
IV. Electrical connection
C Flow switch
D Temperature limiter
TR1000 4 T, TR1000R 4 T: Connect the appliance to the
mains.
TR1000 5 T, TR1000 6 T, TR1000 6 B
The installation of non plug-in ready appliances must be
undertaken by the respective utility operator or by a qualified
specialist company, who can also assist you when you are
requesting the approval of the utility company for installation
of the appliance.
The appliances must be connected with a NYM-J3x4 (mm
mains lead. Leads with a larger cross-section must not be used.
Connect the appliance in accordance with the connection
diagram on the strip terminal.
Screw the housing cover back on.
After installation, give the user the operating
instructions and explain how the appliance works.
Tronic 1000 – 6720876020 (2022/03)
2
)
loading