HR Matic HR B120+ Manual De Instalación página 32

Idiomas disponibles

Idiomas disponibles

3.
Now check the correct connection of the motors:
OPENING DIRECT
INSTALL
If the direction of a leaf is incorrect, it will be necessary to reverse the motor phases (AP/CH) associated to that leaf.
Each time the PP key is pressed, the direction of the leaves will be opposite to the previous one.
4.
Once the correct functioning of the motors and their direction has been verified, return the leaves to the halfway
point.
5.
Press the ENT key to enter the installation process.
START?
OK
NB: The motor force applied during the installation process is that defined in the "ADVANCED MENU" -> "FORCE
CONTROL M1 / FORCE CONTROL M2" (see paragraph 9.2).
6. For systems with electromechanical motors, the control unit performs an opening manoeuvre followed by a closing
manoeuvre to learn the operating times and features of the gate.
For systems with hydraulic motors, the control unit does not perform any manoeuvre, bringing the M1 and M2
operating times to the maximum value of 60s. The installer must then position the gate leaves in a fully closed position
and manually adjust the operating times by accessing the "ADVANCED MENU" -> "WORK TIME M1 / WORK TIME
M2" (see paragraph 9.2) in order to carry out a complete opening manoeuvre.
The control unit always adds an extra 5s to the set value.
WARNING! During installation, obstacle detection is disabled. Make sure there are no
obstacles within the gate movement area that would cause incorrect installation.
NOTE: to obtain a better result, installation is recommended with cold motors,
i.e. not overheated due to a considerable number of consecutive
manoeuvres.
When the control unit installed, the display will show the Step-by-Step mode in the first row and the gate status in the
second row (in this case it must be CLOSED at the end of learning).
Keeping the PP key pressed down will make the M1 leaf (hinged door) open. Depending
on the set phase displacement, the M2 leaf (beaten door) will then move. The two leaves
will stop when the PP key is released.
OPENING DIRECT
INSTALL
START INSTALLATION?
Press the ENT key to start the learning process.
Press the ESC key to cancel the installation process.
13
CLOSING DIRECT
INSTALL
loading