TO
REMOVE
SNOW
THROWER
FROM CARTON
,
.
3,
4.
5.
Locate all parts packed separately
and remove from the carton.
NOTE:
Place fuel stabilizer
in a
safe place until needed for storage.
Remove and discard the packing
material from around the snow
thrower.
Cut down all four corners of the car-
ton and lay the panels flat.
Cut the straps that secure the axle
to the pallet.
For shipping purposes, the height
adjust skids are attached to the
pallet. Remove the screw that se-
cures each height adjust skid to
the pallet. See Figure 2.
,
,
8.
Roll snow thrower off the pallet by
pulling on the lower handle.
CAU-
TION= DO NOT back over control
cables.
Remove all packing material from
the unit.
Cut ties securing the clutch control
cable to the lower handle and lay
cable back away from the motor
frame.
Auger Drive Lever
n
"'-_
- L_
Traction
_
Drive Lever
_" Clutch Cable
nk Assembly
_
Chute
_11_
Deflect°r
Lever
Height
Adjust
Skid
Scre_
Figure 2
TO ASSEMBLE
THE HANDLE
AND
CRANK
ASSEMBLY
1, Cut tie holding shift rod to lower
handle and move shifter to the first
forward gear.
2.
Cut and discard the plastic tie that
secures the crank assembly.
3. Loosen, but do not remove, the
screws, flatwashers,
Iockwashers,
and hex nuts in the upper holes of
the lower handle.
See Figure 3.
4. Remove the fasteners
and the eye-
bolt from the lower holes of the low-
er handle See Figure 5.
NOTE:
Make sure the cables are
not Caught between the upper and
lower handle.
5.
Raise the upper handle into operat-
ing position.
RightHandSide
_,
/
Of Upper Handle
Loosen,
but do not
remove
11132"
Flatwasher
5/16"
Screw
5/16"
Figure 3