GE PVM1790 Instrucciones De Instalación página 16

Horno para colocar encima de la estufa
Ocultar thumbs Ver también para PVM1790:
Idiomas disponibles

Idiomas disponibles

Installation Instructions
To use toggle bolts:
B4] ADAPTING BLOWER FOR
;
Spacing for Toggles More
OUTSIDE
BACK
EXHAUST
hi
Than Wall Thickness
Remove the three screws that hold the blower
Mounting
ff: {Toggle Wings
.
.
plate to the oven. Slide blower plate from under
Plate \ |
Toggle
x .
its retaining flange. Remove and save the screw
Heh
Bolt
that holds blower motor to oven.
Retaining
Flange
Bolt End
Place the mounting plate against the wall and insert
Blower Motor
the toggle wings into the holes in the wall to mount
x94
Screw
the plate.
NOTE: Before tightening toggle bolts and wood screw,
Carefully pull out the blower unit. The wires
make sure the tabs on the mounting plate touch
will extend far enough to allow you to adjust
the bottom of the cabinet when pushed flush against
the blower unit.
the wall and that the plate is properly centered under
the cabinet.
BEFORE: Fan Blade
Openings Facing Up
CAUTION:
se careful to avoid pinching
fingers between the back of the mounting
plate and the wall.
Tighten all bolts. Pull the plate away from the wall
End A
to help tighten the bolts.
Rotate blower unit counterclockwise 180°.
Before Rotation
After Rotation
B3}
USE TOP CABINET TEMPLATE
FOR PREPARATION OF TOP
CABINET
You need to drill holes for the top support screws and
a hole large enough for the power cord to fit through.
Gently remove the wires from the grooves.
Reroute the wires through grooves on other side
of the blower unit.
Before Rerouting
After Rerouting
e Read the instructions on the TOP CABINET
TEMPLATE.
¢ Tape it underneath the top cabinet.
¢ Drill the holes, following the instructions on the
TOP CABINET TEMPLATE.
ACAUTIO N:
Wear safety goggles when
Wires Routed Through Right Side
Wires Routed Through Left Side
drilling holes in the cabinet bottom.
16
loading

Este manual también es adecuado para:

Cvm1790Pvm1790dr1ccCvm1790xs1sl