7. Installation
94
7.K Ceramic chamber installation and removal.
The Compact Bio boiler is equipped with a ceramic chamber which enhances its
efficiency and reduces its emissions.
List of ceramic chamber elements:
1. ceramic chamber bottom cover
2. eramic chamber burner side cover
3. ceramic chamber cap side cover
4. ceramic chamber rear cover
5. ceramic chamber top cover
6. ceramic chamber thermal insulation
7. ceramic chamber thermal insulation.
Start the removal of the ceramic chamber by taking out the Platinum Bio burner.
Then remove elements in the following order: 5; 2; 3; 4; 1; 7; 6.
For installation reverse the procedure.
Compact Bio / Compact Bio Luxury User Manual – EN 07.15
Experts in biomass heating