9. Important| 10. Decommissioning | 11. Quick reference guide | 12. Final ...
9. Important
Before burner start-up check water level
in the heating system.
Fuel storage hopper must be filled with fuel to the
required level to ensure reliable boiler operation.
CAUTION!
Using fuel with different specifications may affect device
operation and cause damage. Fuel with foreign material
(e.g. stones) is unsuitable as well. The manufacturer is
not liable for any damage of using fuel with different
specifications.
Use safety gloves as a protection against burns and follow
safe operation guidelines to ensure safe maintenance.
Heat exchanging surfaces are contaminated during operation resulting in an
increase in temperature at the flue gas outlet and reduced efficiency.
CAUTION!
The device has to be installed and commissioned by a
company authorized by the manufacturer, otherwise it
may invalidate the warranty.
Do not open the doors and covers while boiler is in operation (burn hazard). Do
not open doors during fuel ignition (explosion hazard). Do not use starters and
flammable materials to light a fire. Do not store flammable materials near the
boiler or the burner.
Keep the minimum return temperature (45°C) to ensure correct boiler operation
- risk of flue gas water condensation. Some condensate may occur during start-up
(heating).
After the heating season, thoroughly clean the boiler and the flue ducts.
Keep the boiler room clean and dry.
Experts in biomass heating
10. Boiler decommissioning
Most of the boiler components are made of steel and can be disposed of by
returning to an authorised scrap yard. Other components must be disposed of in
compliance with binding regulations.
11. Quick reference guide - Fire and safety
1.
Please read the Operation and Maintenance Manual before boiler start-up.
2.
Do not use solvents, petrol etc. to light a fire.
3.
Do not open electrical devices during live working to avoid electric shock.
4.
Place the required fire fighting equipment in the fuel store and the boiler
room.
5.
Prevent unauthorised access.
6.
The heating system equipment may be operated by authorised and trained
personnel only.
7.
Check the wiring system and the flue system periodically.
8.
Do not block the vents.
9.
Check burner operation and flue gas quality, adjust the burner or analyse
flue gas as required.
10. Disconnect the power supply (main switch) before maintenance.
11. Notify your supervisor of any faults.
12. Keep the boiler room clean and tidy.
13. The device may be repaired by trained and authorised personnel or an
authorised service centre only.
14. Use carbon dioxide or dry powder extinguisher only.
12. End notes for installers SERVICE CENTRE
•
Connect the boiler to the hydraulic system by installing the mixing valve
with the boiler circulation pump which ensures the return water tempera-
ture of at least 45°C.
•
Before connecting the boiler to the flue system, contact the relevant
authorities for approval.
•
The compression tank must be connected with the boiler via a supply duct
without any cut-off devices.
Compact Bio / Compact Bio Luxury User Manual – EN 07.15
101