nOTE: Ensure that all six lances 3 are completely seated
in the lance slots
4
.
2. With the required tools and hardware close at hand,
position DWST82822 power tool holster
and straighten using a level.
3. Place screws in the screw holes
distance between each mounting point is not less
than 16" (406 mm). Always follow the masonry screw
manuafacturer instructions when installing.
DWST82824 Assembly and Installation
(Fig. F—L)
Required Tools and Hardware
You will need to gather a few common tools and hardware.
Always consult your local building code for proper hardware.
D
WALT METAl RAil MOUnTing insTAllATiOn
e
•
Safety glasses
•
Gloves
•
Screwdriver
•
3/8" (10mm) wrench
•
7/16" (11mm) wrench
•
5/32" (4mm) hex wrench
•
8-32 X 3/8 screws
•
1/4-20 x .0750 Socket head scr ew
•
Nuts
13
•
Spacer block
17
OPTiOnAl WAll MOUnTing insTAllATiOn
•
Safety glasses
•
Gloves
•
3/8" (10mm) wrench
•
#14x 3" screw
10
•
Washer
14
‑
Use the included #14x 3" screws
wood studs.
CAUTION: Always use the correct screws for the
surface that D
WALT power tool wall cabinet will be
e
anchored in. Using the wrong screw will reduce the
holding force required for proper installation possibly
resulting in personal injury or property damage.
Decide how you would like to install your DWST82824 power
tool wall cabinet
5
before you begin.
1. DWST82824 power tool wall cabinet
on a wood framed wall. It may also be installed over
drywall and metal studs.
WARNING: Before attempting to attach D
power tool wall cabinet to metal studs and drywall
consult your local authority having jurisdiction
"AHJ" for proper fastening requirements.
Improper installation can cause personal injury and or
property damage.
D
WALT Metal Rail Mounting (Fig. F—K)
e
1. Assemble the cabinet shelf
cabinet
5
using four 1/4-20 x .0750 socket head screw
1
on the wall
20
. Ensure the
11
10
for mounting to
can be installed
5
WALT
e
6
to the power tool wall
11
and four nuts
13
hardware to 15 in/lbs.
2. Install the grommets
shown each side of the wall cabinet
3. Attach upper shelf
8
x 3/8 screws 12 as shown in Fig. H. Hand tighten the
screws and ensure the shelf is secured in place.
4. Slide the lower power tool holster
cabinet
5
engaging the lances
in the wall cabinet
5
.
nOTE: Ensure that all six lances
seated in the lance slots
5. Secure the lower power tool holster
tool cabinet
5
using four 1/4-20 x .0750 socket head
screw
11
and four nuts
the hardware to 15 in/lbs.
6. Secure the metal rail mounting bracket
assembled wall cabinet
socket head screw
11
Fig. J. Torque the hardware to 15 in/lbs.
7. After assembly is complete place top mat
upper shelf
8
.
8. Remove the paper backing from the two spacer
blocks
17
. Install the two spacer blocks
sticky side to the back of the cabinet
nOTE: Spacer blocks
corners of the cabinet, approximately 1" (25mm) from
the edges.
9. Mount the cabinet assembly
rail so the metal rail mounting bracket
shown in Fig. K.
nOTE: The cabinet assembly
over end caps on the D
assembly
24
must be hung left or right of the end caps.
Wall Mounting (Fig. F, g, l)
1. Assemble the cabinet shelf
cabinet
5
using four 1/4-20 x .0750 socket head screw
11
and four nuts
13
hardware to 15 in/lbs.
2. Install the grommets
shown each side of the wall cabinet
3. Locate and mark wall studs
4. Drill two 1/8" pilot holes.
nOTE: Use outside screw holes
studs 24" (609 mm) on center. Use inside screw holes
for mounting to studs 16" (406 mm) on center tas shown
in Fig. L.
5. Position the DWST82824 power tool wall cabinet
the wall and straighten it using a level.
6. Place a washer
14
on each #14x 3" screw
the screws through the screw holes
in Fig. L.
7. Drive the #14x 3" screws
or
26
and into the wall studs
8. After assembly is complete place top mat
upper shelf
8
.
as shown in Fig. F. Torque the
9
in the grommet holes
5
as shown in Fig. G.
t o wall cabinet
5
with four 8-32
8
under the wall
22
into the lance slots
22
are completely
23
.
7
to the
13
as shown in Fig. I. Torque
15
to the
5
using four 1/4-20 x .0750
and four nuts
13
as shown in
16
in the
17
5
.
17
should be located on the lower
24
to a D
WALT metal
e
15
engages as
24
can not be placed
WALT metal rail. The cabinet
e
6
to the power tool wall
as shown in Fig. F. Torque the
in the grommet holes
9
as shown in Fig. G.
5
19
if installing over drywall.
25
for mounting to
10
and insert
25
or
26
11
through the screw holes
19
until snug.
16
in the
English
21
as
23
with the
as
21
26
5
onto
as shown
25
7