Check that the emergency stop
switch
is not pressed. It can be
5
released by rotating it to the left.
Voltage can now be applied
to the power line to which the
charger
is connected.
1
If you are not using an
energy management
system, Master/Slave function or
a Smart Meter, the cable glands
for energy management
the Master/Slave cable gland
remain unused. In this case,
leave the prefitted blanking plugs
in place, to guarantee that the
25
device is sealed.
LCD display for basic settings:
Undo the 4 screws for the basic
settings cover
the charger
Remove the basic settings cover
and put it on one side.
35
With the cover detect switch
the device automatically detects
that the basic settings cover
is not there and displays the
settings on the digital charging
display
.
3
Setting the max. charge
current:
Setting the max. charge current.
So that no circuit breakers
(building protection) which are
positioned before the charger
are triggered, the charger
1
must be set in accordance with
16
GB/IE/NI/CY/MT
25a
on the side of
36
.
1
the line fuse for the building.
The charge current must not,
under any circumstances, be set
higher than the line fuse itself.
Using the rotary switch for max.
charge current
the charge current as follows:
Code
for
rotary
switch
and
42
26
0
1
2
3
4
5–9
Energy management setting:
For local load management,
,
several chargers will be networked
38
with one another using an RS485
bus. These chargers share the
35
total current available. An external
control system is therefore not
required. By using this local load
management system, the person
commissioning the system does
not have worry about the commu-
nication between the chargers.
They only need to follow the
settings shown below.
The energy management (Master/
Slave) is adjusted as follows,
1
you can adjust
42
3 Phase
1 Phase
400 V AC
AC 230 V
6 A
9A
13 A
13 A
16 A
16 A
32 A
32 A
/
9 A
9 A
/