Kohler Oblo K-123B16-SANA-CP Instrucciones De Instalación página 9

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Install the Control Box
NOTE: Verify that the flex hose can be connected to the supply stop and the control
box inlet before installing the control box to the wall.
Position the control box next to the hole for the spout tube and sensor cables.
Drill 1/8" (3 mm) pilot holes.
Use the standard wall anchors (provided) depending on your wall material.
Attach the control box to the wall with the arrow pointing upward. Secure with
the two screws (provided).
Unthread the control box screws to remove the cover.
Kohler Co.
G1/2 Inlet
Filter Screen
9
1561536-2-A
Tabla de contenido
loading

Este manual también es adecuado para:

Loure k-123l36-sanl-cp

Tabla de contenido